DISCRETE
Industrial Pt100 RTD Temperature Sensor
Precision assembly, Pt100 element fabrication, laser welding, electronics assembly, ISO 17025 calibration and certification · US
Total Cost
$454 / unit
Capacity (units/year)
500,000
Throughput %
85%
Working capital
$20.0M Mn
Capex
$25.0M Mn
Offsite
$0.00 Mn
Total investment
$45.0M Mn
Lines
13
Net raw material
$268
59.0%
Conversion
$186
41.0%
Total / unit
$454
$ per unit
Raw Material
$268 / unit
| Line | Consumption | Unit | Price (USD) | Cost / unit |
|---|---|---|---|---|
| Platinum group metal elements (Pt100)Live | kg | $196 | ||
| Stainless steel and exotic alloy sheathing (316L)Live | kg | $0.11 | ||
| Electronics and signal processing (PCB, ICs, transmitter) | piece | $72.00 |
Utility
$0.21 / unit
| Line | Consumption | Unit | Price (USD) | Cost / unit |
|---|---|---|---|---|
| Factory electricity (assembly and test)Live | kWh | $0.21 |
Operating
$88.00 / unit
| Line | Price (USD) | Cost / unit |
|---|---|---|
| Mechanical assembly and welding (direct labour) | $28.00 | |
| Calibration and certification (ISO 17025) | $32.00 | |
| R&D and product engineering | $28.00 |
Overhead
$65.00 / unit
| Line | Price (USD) | Cost / unit |
|---|---|---|
| Quality assurance and testing (inspection labour, test equipment amortisation) | $24.00 | |
| Sales, marketing, and admin (G&A allocation) | $28.00 | |
| Factory overhead (rent, facilities, support labour) | $13.00 |
Depreciation
$5.00 / unit
| Line | Price (USD) | Cost / unit |
|---|---|---|
| Manufacturing equipment depreciation (assembly lines, calibration rigs, test chambers) | $5.00 |
Others
$28.00 / unit
| Line | Price (USD) | Cost / unit |
|---|---|---|
| Packaging (protective case, labelling, insert) | $8.00 | |
| Distribution and logistics (freight, warehouse) | $20.00 |
Prices stored in USD; converted to your selected currency at the latest ECB rate. Inputs marked "Live" pull current observed prices from Claight commodity data.