DISCRETE

ANSI Z87.1 Safety Spectacle

Injection Molding and Assembly (Asia) · CN
Total Cost
$1,089 / unit
Capacity (units/year)
500,000
Throughput %
85%
Working capital
$2.0M Mn
Capex
$5.0M Mn
Offsite
$1.5M Mn
Total investment
$8.5M Mn
Lines
14
Net raw material
$1.46
0.1%
Conversion
$1,087
99.9%
Total / unit
$1,089
$ per unit

Raw Material

$1.46 / unit
LineConsumptionUnitPrice (USD)Cost / unit
Polycarbonate Resin (Lens)Livekg$0.10
Frame Materials (Nylon/TR90 + Metal)kg$0.96
Component Hardware (Hinges, Screws, Nose Pads)kg$0.40

Utility

$0.00 / unit
LineConsumptionUnitPrice (USD)Cost / unit
Factory Utilities (Electricity, Compressed Air, Water)kWh$0.00

Operating

$1,085 / unit
LinePrice (USD)Cost / unit
Lens Manufacturing (Molding, Coating, Hard-Coat)$587
Frame Manufacturing (Injection Molding, Assembly)$448
Direct Labor (Assembly and Finishing)$50.00

Overhead

$0.40 / unit
LinePrice (USD)Cost / unit
Manufacturer Overhead and SG&A Allocation$0.40

Depreciation

$0.25 / unit
LinePrice (USD)Cost / unit
Tooling and Equipment Depreciation$0.25

Others

$1.92 / unit
LinePrice (USD)Cost / unit
Quality Assurance and Testing (In-line + Third-party Lab)$0.48
Certification and Compliance (ANSI/EN Licensing)$0.24
Packaging and Labeling (Corrugated, Print, Compliance)$0.32
Logistics and Freight (Asia to US, Standard Container)$0.64
Tariffs and Duties (Section 301, Chinese Origin)$0.24
Prices stored in USD; converted to your selected currency at the latest ECB rate. Inputs marked "Live" pull current observed prices from Claight commodity data.