DISCRETE

Steel Posts and Bollards (Galvanized and Powder-Coated)

Fabrication — laser cutting, welding, machining, hot-dip galvanizing, powder coating, QA/inspection, packaging for distribution · US
Total Cost
$42.00 / unit
Capacity (units/year)
12,000
Throughput %
85%
Working capital
$1.4M Mn
Capex
$5.2M Mn
Offsite
$1.8M Mn
Total investment
$8.4M Mn
Lines
13
Net raw material
$25.21
60.0%
Conversion
$16.79
40.0%
Total / unit
$42.00
$ per unit

Raw Material

$25.21 / unit
LineConsumptionUnitPrice (USD)Cost / unit
Carbon Steel Pipe — 89mm OD, SCH 40 (hot-rolled coil)kg$14.40
Zinc (for hot-dip galvanizing bath)Livekg$7.09
Powder Coating Resin (polyester/epoxy blend)kg$1.92
Packaging Materials (corrugate, strapping, labels)unit$1.80

Utility

$1.64 / unit
LineConsumptionUnitPrice (USD)Cost / unit
Electricity (fabrication, galvanizing line, powder booth)kWh$0.65
Natural Gas (galvanizing furnace, powder cure oven)m3$0.99

Operating

$7.92 / unit
LinePrice (USD)Cost / unit
Direct Fabrication Labor (laser cutting, welding, machining, assembly)$4.95
Surface Treatment Labor (galvanizing, powder coating, passivation)$1.65
QA, Inspections, and Scrap/Warranty Reserve$1.32

Overhead

$2.88 / unit
LinePrice (USD)Cost / unit
Factory Overhead (facility, equipment maintenance, admin, safety, logistics)$2.88

Depreciation

$2.10 / unit
LinePrice (USD)Cost / unit
Equipment Depreciation (laser cutters, welding robots, galvanizing line, cure ovens, conveyors)$2.10

Financing

$0.81 / unit
LinePrice (USD)Cost / unit
Working Capital Financing Cost (receivables, inventory float)$0.81

Others

$1.44 / unit
LinePrice (USD)Cost / unit
Margin (competitive pressure, target EBITDA)$1.44
Prices stored in USD; converted to your selected currency at the latest ECB rate. Inputs marked "Live" pull current observed prices from Claight commodity data.