Portable Concrete Mixer, 6 cu ft, Gasoline
Fabrication, welding, paint, and final assembly · US
Total Cost
$90.94 / unit
Capacity (units/year)
10,000
Throughput %
85%
Working capital
$1.5M Mn
Capex
$5.5M Mn
Offsite
$800.0K Mn
Total investment
$7.8M Mn
Lines
13
Net raw material
$15.94
17.5%
Conversion
$75.00
82.5%
Total / unit
$90.94
$ per unit
Raw Material
$101 / unit
| Line | Consumption | Unit | Price (USD) | Cost / unit |
|---|---|---|---|---|
| Steel (drum, frame, chassis)Live | kg | $50.36 | ||
| Gearbox and transmission | piece | $28.00 | ||
| Paint and finishing | kg | $12.00 | ||
| Electrical components (wire, switch, plug) | kg | $8.00 | ||
| Tires and wheelsLive | piece | $2.59 |
Co-Product
$85.00 / unit
| Line | Consumption | Unit | Price (USD) | Cost / unit |
|---|---|---|---|---|
| Engine (5-6 HP gasoline) | piece | $85.00 |
Utility
$5.00 / unit
| Line | Consumption | Unit | Price (USD) | Cost / unit |
|---|---|---|---|---|
| Factory utilities (electricity, compressed air) | MWh | $5.00 |
Operating
$15.00 / unit
| Line | Price (USD) | Cost / unit |
|---|---|---|
| Direct labor (assembly, welding, testing) | $15.00 |
Overhead
$16.00 / unit
| Line | Price (USD) | Cost / unit |
|---|---|---|
| Factory overhead and SG&A | $16.00 |
Depreciation
$12.00 / unit
| Line | Price (USD) | Cost / unit |
|---|---|---|
| Equipment and building depreciation | $12.00 |
Financing
$7.00 / unit
| Line | Price (USD) | Cost / unit |
|---|---|---|
| Capital financing cost | $7.00 |
Others
$20.00 / unit
| Line | Price (USD) | Cost / unit |
|---|---|---|
| Packaging | $7.00 | |
| Margin | $13.00 |
Prices stored in USD; converted to your selected currency at the latest ECB rate. Inputs marked "Live" pull current observed prices from Claight commodity data.