DISCRETE

Once-Through Steam Generator

Custom fabrication — pressure-part welding, tube expansion, heat treatment, hydrostatic testing, and commissioning in a coded fabrication shop · US
Total Cost
$706,937 / unit
Capacity (units/year)
20
Throughput %
85%
Working capital
$3.0M Mn
Capex
$18.0M Mn
Offsite
$0.00 Mn
Total investment
$21.0M Mn
Lines
15
Net raw material
$296,857
42.0%
Conversion
$410,080
58.0%
Total / unit
$706,937
$ per unit

Raw Material

$296,857 / unit
LineConsumptionUnitPrice (USD)Cost / unit
Alloy Tube — T91/T22/P91Livekg$56,035
Pressure Vessel Heads and HeadersLivekg$28,818
Structural Steel and Casingkg$28,800
Combustion System (burners, castings, controls)Livepiece$3.59
Instrumentation and Controls (valves, transmitters, PLC)piece$140,000
Piping, Fittings, and Flangeskg$43,200

Utility

$165,000 / unit
LineConsumptionUnitPrice (USD)Cost / unit
Shop Utilities (electricity, natural gas, shop air)MWh$165,000

Operating

$75.00 / unit
LinePrice (USD)Cost / unit
Fabrication Labor (welding, fitting, assembly, machining, test)$75.00

Overhead

$3.00 / unit
LinePrice (USD)Cost / unit
Fabrication Shop Overhead$1.00
Engineering and Documentation (design, FEA, QA docs)$1.00
SG&A, Warranty Reserve, and Margin$1.00

Depreciation

$120,000 / unit
LinePrice (USD)Cost / unit
Fabrication Equipment Depreciation$120,000

Financing

$125,000 / unit
LinePrice (USD)Cost / unit
Working Capital and Capex Financing Cost$125,000

Others

$2.00 / unit
LinePrice (USD)Cost / unit
QA, Hydrostatic Testing, Code Inspection$1.00
Logistics and Field Commissioning Support$1.00