BULK

Industrial Welded Carbon Steel Pipes

ERW and SAW tube forming with submerged arc or high-frequency welding, followed by NDT, heat treatment, and hydrostatic testing · US
Total Cost
$764 / MT
Capacity (tonnes/year)
100,000
Throughput %
85%
Working capital
$20.0M Mn
Capex
$60.0M Mn
Offsite
$5.0M Mn
Total investment
$85.0M Mn
Lines
10
Net raw material
$692
90.6%
Conversion
$71.78
9.4%
Total / MT
$764
$ per MT

Raw Material

$692 / MT
LineConsumptionUnitPrice (USD)Cost / MT
Hot-Rolled Coil (HRC) — raw material inputtonne$683
Welding wire and SAW fluxkg$9.90

Utility

$3.78 / MT
LineConsumptionUnitPrice (USD)Cost / MT
Natural gas (heat treatment + SAW welding)GJ$3.15
Electricity (forming, welding, NDT, utilities)LiveMWh$0.63

Operating

$36.10 / MT
LinePrice (USD)Cost / MT
Direct labour (forming, welding, testing, finishing)$35.00
Maintenance materials and operating supplies$1.10

Overhead

$24.50 / MT
LinePrice (USD)Cost / MT
Quality assurance, NDE, certification, and inspection$5.50
Factory overhead (indirect labour, insurance, site services)$19.00

Depreciation

$4.00 / MT
LinePrice (USD)Cost / MT
Depreciation (buildings, machinery, equipment — 20-yr straight-line)$4.00

Financing

$3.40 / MT
LinePrice (USD)Cost / MT
Cost of capital (8% WACC on capex + working capital + offsite)$3.40
Prices stored in USD; converted to your selected currency at the latest ECB rate. Inputs marked "Live" pull current observed prices from Claight commodity data.