DISCRETE
Industrial Gas Turbine (150 MW class)
Precision-machined superalloy turbomachinery — investment-cast hot-section, CNC-turned rotor, fully integrated control system · US
Total Cost
$34,004,675 / unit
Capacity (units/year)
5
Throughput %
85%
Working capital
$50.0M Mn
Capex
$140.0M Mn
Offsite
$0.00 Mn
Total investment
$190.0M Mn
Lines
13
Net raw material
$4,675
0.0%
Conversion
$34,000,000
100.0%
Total / unit
$34,004,675
$ per unit
Raw Material
$4,675 / unit
| Line | Consumption | Unit | Price (USD) | Cost / unit |
|---|---|---|---|---|
| Nickel-based superalloy (rotor, discs, structural)Live | kg | $3,807 | ||
| Titanium alloy (compressor blades, casings)Live | kg | $375 | ||
| Structural & alloy steel (casing, frame, piping)Live | kg | $43.79 | ||
| Specialty alloys & fittings (seals, bolting, shields) | kg | $450 |
Operating
$26,700,000 / unit
| Line | Price (USD) | Cost / unit |
|---|---|---|
| Precision machining — rotor, casing, discs, balance | $10,800,000 | |
| Hot-section components — SC blades, vanes, combustor, TBC | $7,200,000 | |
| Controls & electronics — DCS, sensors, actuators, harness | $3,200,000 | |
| Assembly, integration, NDT, testing & documentation | $3,000,000 | |
| Turbomachinery engineering, design, LOA & certification | $2,500,000 |
Overhead
$4,100,000 / unit
| Line | Price (USD) | Cost / unit |
|---|---|---|
| Factory overhead — facilities, maintenance, utilities, supplies | $2,000,000 | |
| SG&A allocation — management, procurement, quality systems | $2,100,000 |
Depreciation
$1,400,000 / unit
| Line | Price (USD) | Cost / unit |
|---|---|---|
| Facility & equipment depreciation (20-yr straight-line) | $1,400,000 |
Others
$1,800,000 / unit
| Line | Price (USD) | Cost / unit |
|---|---|---|
| Logistics — heavy haul, export packing, freight insurance | $1,800,000 |
Prices stored in USD; converted to your selected currency at the latest ECB rate. Inputs marked "Live" pull current observed prices from Claight commodity data.