DISCRETE
Flow Measurement Instrumentation
Precision instrument assembly with wetted-parts machining, electronics integration, and multi-point calibration · US
Total Cost
$597 / unit
Capacity (units/year)
50,000
Throughput %
85%
Working capital
$6.0M Mn
Capex
$12.0M Mn
Offsite
$0.00 Mn
Total investment
$18.0M Mn
Lines
14
Net raw material
$168
28.2%
Conversion
$429
71.8%
Total / unit
$597
$ per unit
Raw Material
$168 / unit
| Line | Consumption | Unit | Price (USD) | Cost / unit |
|---|---|---|---|---|
| Stainless steel 316L (meter body, flow tubes, flanges)Live | kg | $24.55 | ||
| Aluminum (mounting brackets, junction box)Live | kg | $1.71 | ||
| Electronics module (PCB, display, comms ASIC) | piece | $68.00 | ||
| Sensor elements (pressure transducer, RTD, velocity) | piece | $42.00 | ||
| Precision-machined wetted parts (finished) | piece | $32.00 |
Utility
$200 / unit
| Line | Consumption | Unit | Price (USD) | Cost / unit |
|---|---|---|---|---|
| Factory utilities (electricity, compressed air, inert gas) | MWh | $200 |
Operating
$85.00 / unit
| Line | Price (USD) | Cost / unit |
|---|---|---|
| Calibration and metrology (PTB/NIST traceable) | $45.00 | |
| Assembly, integration, and testing | $40.00 |
Overhead
$82.00 / unit
| Line | Price (USD) | Cost / unit |
|---|---|---|
| Factory overhead (maintenance, indirect labor, tools) | $36.00 | |
| SG&A allocation (engineering support, sales, admin) | $46.00 |
Depreciation
$30.00 / unit
| Line | Price (USD) | Cost / unit |
|---|---|---|
| Depreciation (equipment, tooling, building) | $30.00 |
Financing
$12.00 / unit
| Line | Price (USD) | Cost / unit |
|---|---|---|
| Working capital financing cost | $12.00 |
Others
$20.00 / unit
| Line | Price (USD) | Cost / unit |
|---|---|---|
| Quality assurance and documentation (certifications, FATs) | $15.00 | |
| Packaging and logistics | $5.00 |
Prices stored in USD; converted to your selected currency at the latest ECB rate. Inputs marked "Live" pull current observed prices from Claight commodity data.