DISCRETE

Fibre Drums — 207L 14-ply UN 1A1

Sheet winding and drum forming with steel chime closure assembly · US
Total Cost
$47.92 / unit
Capacity (units/year)
2,000,000
Throughput %
85%
Working capital
$2.5M Mn
Capex
$10.0M Mn
Offsite
$2.0M Mn
Total investment
$14.5M Mn
Lines
12
Net raw material
$3.19
6.7%
Conversion
$44.72
93.3%
Total / unit
$47.92
$ per unit

Raw Material

$3.19 / unit
LineConsumptionUnitPrice (USD)Cost / unit
Kraft paperboard (14-ply caliper stack, per unit)Livekg$1.82
Steel chime plates and locking bandkg$1.08
Synthetic rubber gasketLivekg$0.29

Utility

$0.07 / unit
LineConsumptionUnitPrice (USD)Cost / unit
Natural gas (process heat and air compression)m3$0.06
Electricity (plant-wide, motor and controls)kWh$0.01

Operating

$42.00 / unit
LinePrice (USD)Cost / unit
Assembly and closing operations labour (fully-loaded)$42.00

Overhead

$0.90 / unit
LinePrice (USD)Cost / unit
Quality control, UN testing and certification$0.30
Factory overhead (facility, management, insurance, R&M)$0.60

Depreciation

$0.55 / unit
LinePrice (USD)Cost / unit
Depreciation (buildings 20yr, equipment 10yr, tooling 5yr)$0.55

Others

$1.20 / unit
LinePrice (USD)Cost / unit
Packing materials (pallet, wrap, label)$0.30
Inbound freight (raw materials to plant)$0.30
Outbound logistics (plant to buyer hub)$0.60
Prices stored in USD; converted to your selected currency at the latest ECB rate. Inputs marked "Live" pull current observed prices from Claight commodity data.